01SC080 : MAGNUM LONG LEAD EDC
56,56$
SKU
220398
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).
Design | Couteaux |
---|---|
Code du Manufacturier | 01SC080 |
UPC | 788857750346 |
SKU | 220398 |
Marque | Boker |